Gandhi, O.P.
2514  Ergebnisse:
Personensuche X
?
1

Maintenance performance evaluation using an integrated appr..:

Aju kumar, V. N. ; Gupta, Piyush ; Gandhi, O. P.
International Journal of System Assurance Engineering and Management.  10 (2018)  1 - p. 57-82 , 2018
 
?
2

Criticality analysis of wind turbine energy system using fu..:

, In: Safety and Reliability – Safe Societies in a Changing World,
Loganathan, M.K. ; Bezbaurah, Indrani ; Gandhi, O.P.. - p. 1727-1733 , 2018
 
?
3

Knowledge management of automobile system failures through ..:

James, Ajith Tom ; Gandhi, O.P. ; Deshmukh, S.G.
Journal of Advances in Management Research.  14 (2017)  4 - p. 425-445 , 2017
 
?
4

Assessment of failures in automobiles due to maintenance er..:

James, Ajith Tom ; Gandhi, O. P. ; Deshmukh, S. G.
International Journal of System Assurance Engineering and Management.  , 2017
 
?
5

Fault diagnosis of automobile systems using fault tree base..:

James, Ajith Tom ; Gandhi, O. P. ; Deshmukh, S. G.
International Journal of System Assurance Engineering and Management.  9 (2017)  2 - p. 494-508 , 2017
 
?
6

Availability analysis of mechanical systems with condition-..:

Kumar, Girish ; Jain, Vipul ; Gandhi, O. P.
Journal of Industrial Engineering International.  14 (2017)  1 - p. 119-131 , 2017
 
?
7

Development of low cost instrumentation to monitor coasting..:

Gupta, Piyush ; Dutt, R. N. ; Gandhi, O. P.
International Journal of System Assurance Engineering and Management.  8 (2016)  S2 - p. 983-989 , 2016
 
?
8

Optimal support strategy for mechanical systems under contr..:

Asjad, Mohammad ; Kulkarni, Makarand S ; Gandhi, O P
Benchmarking: An International Journal.  22 (2015)  7 - p. 1395-1416 , 2015
 
?
 
?
10

Maintenance cost minimization of manufacturing systems usin..:

Loganathan, M. K. ; Gandhi, O. P.
International Journal of System Assurance Engineering and Management.  7 (2015)  1 - p. 47-61 , 2015
 
?
11

Availability evaluation of manufacturing systems using Semi..:

Loganathan, M.K. ; Kumar, Girish ; Gandhi, O.P.
International Journal of Computer Integrated Manufacturing.  29 (2015)  7 - p. 720-735 , 2015
 
?
12

Equipment redesign feasibility through maintenance-work-ord..:

Gupta, Piyush ; Gandhi, O. P.
International Journal of System Assurance Engineering and Management.  5 (2014)  1 - p. 21-31 , 2014
 
?
13

Steady-state availability analysis of repairable mechanical..:

Kumar, Girish ; Jain, Vipul ; Gandhi, O. P.
International Journal of System Assurance Engineering and Management.  5 (2014)  4 - p. 664-678 , 2014
 
?
14

Annual maintenance budget estimation for a plant system: Di..:

Gupta, Piyush ; Gupta, Shashank ; Gandhi, O.P.
Journal of Quality in Maintenance Engineering.  20 (2014)  2 - p. 193-210 , 2014
 
?
15

Evaluation of green maintenance initiatives in design and d..:

Ajukumar, V.N. ; Gandhi, O.P.
Journal of Cleaner Production.  51 (2013)  - p. 34-46 , 2013
 
1-15