Hadi, Gokcen
126  Ergebnisse:
Personensuche X
?
1

Optimization for Fulfilling Education Requirements of Refug..:

, In: Lecture Notes in Management and Industrial Engineering; Engineering Digital Transformation,
Betul, Macit ; Hadi, Gokcen - p. 235-242 , 2018
 
?
3

Performance-Aware Big Data Management for Remote Sensing Sy..:

Pekturk, Mustafa Kemal ; Unal, Muhammet ; Gokcen, Hadi
Arabian Journal for Science and Engineering.  49 (2023)  3 - p. 3845-3865 , 2023
 
?
5

Data Centers in Sustainability and Green Computing:

, In: Advances in Marketing, Customer Relationship Management, and E-Services; Achieving Economic Growth and Welfare Through Green Consumerism,
 
?
7

Distance Education Service Quality in Turkey:

Gök, Başak ; Gökçen, Hadi
Journal of Education in Black Sea Region.  6 (2021)  2 - p. 29-43 , 2021
 
?
8

The location routing problem with arc time windows for terr..:

Çetinkaya, Cihan ; Gökçen, Hadi ; Karaoğlan, İsmail
Journal of Industrial and Production Engineering.  35 (2018)  5 - p. 309-318 , 2018
 
?
 
?
11

A genetic algorithm approach for optimising a closed-loop s..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Demirel, Neslihan ; Gökçen, Hadi ; Özceylan, Eren.. (2014)  12 - p. 3637-3664
Exemplare: Zentrale;
 
?
12

A genetic algorithm approach for optimising a closed-loop s..:

Demirel, Neslihan ; Özceylan, Eren ; Paksoy, Turan.
International Journal of Production Research.  52 (2014)  12 - p. 3637-3664 , 2014
 
?
13

An integrated model to incorporate ergonomics and resource ..:

Kara, Yakup ; Atasagun, Yakup ; Gökçen, Hadi..
International Journal of Computer Integrated Manufacturing.  27 (2014)  11 - p. 997-1007 , 2014
 
?
14

Two-stage vehicle routing problem with arc time windows: A ..:

Çetinkaya, Cihan ; Karaoglan, Ismail ; Gökçen, Hadi
European Journal of Operational Research.  230 (2013)  3 - p. 539-550 , 2013
 
?
15

Two-sided U-type assembly line balancing problem:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Aǧpak, Kürşad ; Gökçen, Hadi. (2012)  18 - p. 5035-5047
Exemplare: Zentrale;
 
1-15