Ham, Andy
227  Ergebnisse:
Personensuche X
?
1

Integrated Scheduling of Jobs, Tools, Machines, and Two Dif..:

Ham, Andy ; Park, Myoung-Ju ; Fowler, John
IEEE Transactions on Semiconductor Manufacturing.  37 (2024)  1 - p. 27-37 , 2024
 
?
2

Unmanned Aerial Vehicles (UAVs): Persistent Surveillance fo..:

, In: 2022 International Conference on Unmanned Aircraft Systems (ICUAS),
Ham, Andy ; Similien, Delchyne ; Baek, Stanley. - p. 1411-1417 , 2022
 
?
3

Energy-aware flexible job shop scheduling under time-of-use..:

Park, Myoung-Ju ; Ham, Andy
International Journal of Production Economics.  248 (2022)  - p. 108507 , 2022
 
?
4

Energy-Aware Flexible Job Shop Scheduling Using Mixed Integ..:

Ham, Andy ; Park, Myoung-Ju ; Kim, Kyung Min.
Mathematical Problems in Engineering.  2021 (2021)  - p. 1-12 , 2021
 
?
7

Dial-a-ride problem: mixed integer programming revisited an..:

Ham, Andy
Engineering Optimization.  55 (2021)  2 - p. 257-270 , 2021
 
?
8

Integrated scheduling of jobs, reticles, machines, AMHS and..:

, In: Proceedings of the Winter Simulation Conference,
Ham, Andy ; Park, Myoung-Ju ; Shin, Ho-Jun.. - p. 1966-1973 , 2020
 
?
9

Transfer-robot task scheduling in job shop:

Ham, Andy
International Journal of Production Research.  59 (2020)  3 - p. 813-823 , 2020
 
?
10

Transfer-robot task scheduling in flexible job shop:

Ham, Andy
Journal of Intelligent Manufacturing.  31 (2020)  7 - p. 1783-1793 , 2020
 
?
11

Transfer Robot Task Scheduling in Semiconductor Manufacturi..:

, In: 2019 Winter Simulation Conference (WSC),
Ham, Andy - p. 2248-2256 , 2019
 
?
12

Transfer robot task scheduling in semiconductor manufacturi..:

, In: Proceedings of the Winter Simulation Conference,
Ham, Andy - p. 2248-2256 , 2019
 
?
13

Scheduling of drone-based material transfer system in semic..:

, In: Proceedings of the 2017 Winter Simulation Conference,
Ham, Andy ; Kim, DJ - p. 1-7 , 2017
 
?
14

Constraint programming approach for scheduling batch operat..:

, In: 2017 28th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC),
Ham, Andy ; Fowler, John - p. 294-297 , 2017
 
?
15

Flexible job shop scheduling problem for parallel batch pro..:

Ham, Andy
Applied Mathematical Modelling.  45 (2017)  - p. 551-562 , 2017
 
1-15