Jolai, F.
65  Ergebnisse:
Personensuche X
?
2

A new fuzzy-stochastic compromise ratio approach for green ..:

Foroozesh, N. ; Jolai, F. ; Mousavi, S. M..
Neural Computing and Applications.  33 (2021)  13 - p. 7893-7911 , 2021
 
?
3

An enhanced possibilistic programming approach for reliable..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Torabi, S. A. ; Namdar, J. ; Hatefi, S. M... (2016)  5/6 - p. 1358-1387
Exemplare: Zentrale;
 
?
4

A biogeography-based optimisation algorithm for a realistic..:

Rabiee, M. ; Jolai, F. ; Asefi, H...
International Journal of Computer Integrated Manufacturing.  29 (2016)  9 - p. 1007-1024 , 2016
 
?
5

Prepositioning emergency earthquake response supplies: A ne..:

Mohammadi, R. ; Ghomi, S.M.T. Fatemi ; Jolai, F.
Applied Mathematical Modelling.  40 (2016)  9-10 - p. 5183-5199 , 2016
 
?
6

A green vehicle routing problem with customer satisfaction ..:

Afshar-Bakeshloo, M. ; Mehrabi, A. ; Safari, H...
Journal of Industrial Engineering International.  12 (2016)  4 - p. 529-544 , 2016
 
?
7

A novel fuzzy stochastic multi-objective linear programming..:

Sahebjamnia, Navid ; Jolai, F. ; Torabi, S. A..
The International Journal of Advanced Manufacturing Technology.  84 (2015)  1-4 - p. 749-767 , 2015
 
?
9

An enhanced possibilistic programming approach for reliable..:

Torabi, S.A. ; Namdar, J. ; Hatefi, S.M..
International Journal of Production Research.  54 (2015)  5 - p. 1358-1387 , 2015
 
?
10

A credibility-constrained programming for reliable forward–..:

Hatefi, S.M. ; Jolai, F. ; Torabi, S.A..
International Journal of Computer Integrated Manufacturing.  28 (2014)  6 - p. 664-678 , 2014
 
?
11

A hybrid NSGA-II and VNS for solving a bi-objective no-wait..:

Asefi, H. ; Jolai, F. ; Rabiee, M..
The International Journal of Advanced Manufacturing Technology.  75 (2014)  5-8 - p. 1017-1033 , 2014
 
?
12

A novel hybrid genetic algorithm to solve the make-to-order..:

Mirabi, Mohammad ; Fatemi Ghomi, S. M. T. ; Jolai, F.
Journal of Industrial Engineering International.  10 (2014)  2 - p. , 2014
 
?
13

Reliable design of an integrated forward-revere logistics n..:

Hatefi, S. M. ; Jolai, F. ; Torabi, S. A..
KSCE Journal of Civil Engineering.  19 (2014)  4 - p. 1117-1128 , 2014
 
?
14

Robust and reliable forward–reverse logistics network desig..:

Hatefi, S.M. ; Jolai, F.
Applied Mathematical Modelling.  38 (2014)  9-10 - p. 2630-2647 , 2014
 
?
15

Two-stage assembly flow-shop scheduling problem with non-id..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Mozdgir, A. ; Jolai, F. ; Navaei, J... (2013)  12 - p. 3625-3642
Exemplare: Zentrale;
 
1-15