Leung, Joseph Y-T.
63  Ergebnisse:
Personensuche X
?
2

A meta-heuristic for minimizing total weighted flow time on..:

Jia, Zhao-hong ; Zhang, Han ; Long, Wen-tao...
Computers & Industrial Engineering.  125 (2018)  - p. 298-308 , 2018
 
?
3

Integrated scheduling on a batch machine to minimize produc..:

Cheng, Ba-Yi ; Leung, Joseph Y-T. ; Li, Kai
European Journal of Operational Research.  258 (2017)  1 - p. 104-112 , 2017
 
?
4

A multi-objective model for multi-project scheduling and mu..:

Chen, Rong ; Liang, Changyong ; Gu, Dongxiao.
International Journal of Production Research.  55 (2017)  21 - p. 6207-6234 , 2017
 
?
5

Fast approximation algorithms for uniform machine schedulin..:

Leung, Joseph Y-T. ; Ng, C.T.
European Journal of Operational Research.  260 (2017)  2 - p. 507-513 , 2017
 
?
6

Integrated production and delivery with single machine and ..:

Li, Kai ; Zhou, Chao ; Leung, Joseph Y-T..
Expert Systems with Applications.  57 (2016)  - p. 12-20 , 2016
 
?
7

Integrated production and delivery withmultiple factories a..:

Li, Kai ; Zhang, Xun ; Leung, Joseph Y-T..
International Journal of Systems Science: Operations & Logistics.  4 (2016)  3 - p. 219-228 , 2016
 
?
8

Fast approximation algorithms for bi-criteria scheduling wi..:

Lee, Kangbok ; Leung, Joseph Y-T. ; Jia, Zhao-hong...
European Journal of Operational Research.  238 (2014)  1 - p. 54-64 , 2014
 
?
 
?
13

A generalization of the weighted set covering problem:

Yang, Jian ; Leung, Joseph Y‐T.
Naval Research Logistics (NRL).  52 (2005)  2 - p. 142-149 , 2005
 
?
14

Minimizing mean flowtime and makespan on master–slave syste..:

Leung, Joseph Y-T. ; Zhao, Hairong
Journal of Parallel and Distributed Computing.  65 (2005)  7 - p. 843-856 , 2005
 
?
15

Open shops with jobs overlap––revisited:

Leung, Joseph Y-T. ; Li, Haibing ; Pinedo, Michael.
European Journal of Operational Research.  163 (2005)  2 - p. 569-571 , 2005
 
1-15