Liu, Shang-Chia
16408  Ergebnisse:
Personensuche X
?
 
?
2

A Two-Stage Three-Machine Flow Shop Assembly Problem Mixed ..:

Liu, Shang-Chia
Discrete Dynamics in Nature and Society.  2020 (2020)  - p. 1-14 , 2020
 
?
3

An iterated local search and tabu search for two-parallel m..:

Xu, Jianyou ; Liu, Shang-Chia ; Zhao, Chuanli...
Journal of Information and Optimization Sciences.  40 (2019)  3 - p. 751-766 , 2019
 
?
5

Due date assignment and scheduling with time and positional..:

Zhao, Chuanli ; Hsu, Chou-Jung ; Lin, Win-Chin..
Journal of Information and Optimization Sciences.  39 (2018)  8 - p. 1613-1626 , 2018
 
?
6

A two-stage three-machine assembly flow shop scheduling wit..:

Wu, Chin-Chia ; Chen, Jia-Yang ; Lin, Win-Chin...
Swarm and Evolutionary Computation.  41 (2018)  - p. 97-110 , 2018
 
?
7

Bicriterion total flowtime and maximum tardiness minimizati..:

Wu, Chin-Chia ; Liu, Shang-Chia ; Lin, Tzu-Yun...
Computers & Industrial Engineering.  117 (2018)  - p. 152-163 , 2018
 
?
8

An Novel Metaheuristic for the Order Scheduling with Ready ..:

, In: 2017 International Conference on Computing Intelligence and Information System (CIIS),
 
?
9

Re-Entrant Flowshop Scheduling With Learning Considerations..:

Wu, Chin-Chia ; Liu, Shang-Chia ; Cheng, T. C. E....
Iranian Journal of Science and Technology, Transactions A: Science.  42 (2017)  2 - p. 727-744 , 2017
 
?
11

Single-machine scheduling problems with a learning effect m..:

Zhang, Xingong ; Liu, Shang-Chia ; Yin, Yunqiang.
Iranian Journal of Science and Technology, Transactions A: Science.  42 (2016)  3 - p. 1327-1335 , 2016
 
?
12

No-Wait Flexible Flow Shop Scheduling with Due Windows:

Huang, Rong-Hwa ; Yang, Chang-Lin ; Liu, Shang-Chia
Mathematical Problems in Engineering.  2015 (2015)  - p. 1-9 , 2015
 
?
 
?
 
?
15

Ontology construction for information classification:

Weng, Sung-Shun ; Tsai, Hsine-Jen ; Liu, Shang-Chia.
Expert Systems with Applications.  31 (2006)  1 - p. 1-12 , 2006
 
1-15