Mozdgir, A.
10  Ergebnisse:
Personensuche X
?
1

Two-stage assembly flow-shop scheduling problem with non-id..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Mozdgir, A. ; Jolai, F. ; Navaei, J... (2013)  12 - p. 3625-3642
Exemplare: Zentrale;
 
?
2

Two-stage assembly flow-shop scheduling problem with non-id..:

Mozdgir, A. ; Fatemi Ghomi, S.M.T. ; Jolai, F..
International Journal of Production Research.  51 (2013)  12 - p. 3625-3642 , 2013
 
?
3

The prediction of NICU admission and identifying influentia..:

Tashakkori, Reza ; Mozdgir, Ashkan ; Karimi, Atena.
Biomedical Signal Processing and Control.  90 (2024)  - p. 105844 , 2024
 
?
6

Using the Taguchi method to optimize the differential evolu..:

Mozdgir, Ashkan ; Mahdavi, Iraj ; Badeleh, Iman Seyedi.
Mathematical and Computer Modelling.  57 (2013)  1-2 - p. 137-151 , 2013
 
?
7

A reliability/availability approach to joint production and..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Mokhtari, Hadi ; Mozdgir, Ashkan ; Abadi, Isa Nakhai Kamal. (2012)  20 - p. 5906-5925
Exemplare: Zentrale;
 
?
8

A reliability/availability approach to joint production and..:

Mokhtari, Hadi ; Mozdgir, Ashkan ; Kamal Abadi, Isa Nakhai
International Journal of Production Research.  50 (2012)  20 - p. 5906-5925 , 2012
 
?
9

Project time–cost trade-off scheduling: a hybrid optimizati..:

Mokhtari, Hadi ; Aghaie, Abdollah ; Rahimi, Javad.
The International Journal of Advanced Manufacturing Technology.  50 (2010)  5-8 - p. 811-822 , 2010
 
?
10

A Bi-Objective Approach to an Assembly Line Re-Balancing Pr..:

Hadi Mokhtari ; Ashkan Mozdgir
http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-752-1&slc_lang=en&sid=1.  , 2015
 
1-10