Nassef, Ashraf O.
46  Ergebnisse:
Personensuche X
?
 
?
 
?
8

A constructive heuristic for the integrated scheduling of m..:

Abdelmaguid, Tamer F. ; Nassef, Ashraf O.
The International Journal of Advanced Manufacturing Technology.  46 (2009)  9-12 - p. 1239-1251 , 2009
 
?
 
?
11

Fixed-quantity dynamic lot sizing using simulated annealing:

Gaafar, Lotfi K. ; Nassef, Ashraf O. ; Aly, Ahmed I.
The International Journal of Advanced Manufacturing Technology.  41 (2008)  1-2 - p. 122-131 , 2008
 
?
12

A hybrid GA/heuristic approach to the simultaneous scheduli..:

Abdelmaguid, Tamer F. ; Nassef, Ashraf O. ; Kamal, Badawia A..
International Journal of Production Research.  42 (2004)  2 - p. 267-281 , 2004
 
?
14

3D overlapped grouping Ga for optimum 2D guillotine cutting..:

Maged R. Rostom ; Ashraf O. Nassef ; Sayed M. Metwalli
http://www.sciencedirect.com/science/article/pii/S1110016814000659.  , 2014
 
1-15