Parra Negrete, Kevin Armando
10  Ergebnisse:
Personensuche X
?
2

Modelo de simulación dinámica para el incremento de la comp..:

Parra Negrete, Kevin Armando
Ambastha, A., & Momaya, K. (2004). Competitiveness of Firms: Review of theory , frameworks and models, 26(1), 45–61..  , 2021
 
?
3

Dispatching algorithm for production programming of flexibl..:

Ortiz Suarez, Miguel Angel ; Betancourt Ferrer, Leidy Esperanza ; Parra Negrete, Kevin Armando..
430 Alvarez-Valdes, R., Fuertes, A., Tamarit, J. M., Giménez, G., & Ramos, R. (2005). A heuristic to schedule 431 flexible job-shop in a glass factory. European Journal of Operational Research, 165(2005), 525–534. 432 Baker, K. R. (2005). Elements of sequencing and scheduling. Hanover, NH: Tuck School of Business. 433 Barrios, M. A. O., Caballero, J. E., & Sánchez, F. S. (2015). A methodology for the creation of integrated service 434 networks in outpatient internal medicine. In Ambient intelligence for health (pp. 247–257). Springer. 435 Bozek, A., & Wysocki, M. (2015). Flexible job shop with continuous material flow. International Journal of 436 Production Research, 53(4), 1273–1290. 437 Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by Tabu search. Annals of Operations 438 Research, 41(3), 157–183. 439 Calleja, G., & Pastor, R. (2014). A dispatching algorithm for flexible job-shop scheduling with t....  , 2018
 
?
10

Entrepreneurial Intention in Vocational Technical Schools i..:

, In: Communications in Computer and Information Science; Applied Computer Sciences in Engineering,
 
1-10