Sotskov, Jurij Nazarovič
5  Ergebnisse:
Personensuche X
?
1

The optimality box in uncertain data for minimising the sum..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Exemplare: Zentrale;
 
?
2

Mixed graph model and algorithms for parallel-machine job-s..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Sotskov, Jurij Nazarovič ; Gholami, Omid. (2017)  5/6 - p. 1549-1564
Exemplare: Zentrale;
 
?
3

Solving parallel machines job-shop scheduling problems by a..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Gholami, Omid. (2014)  13 - p. 3888-3904
Exemplare: Zentrale;
 
?
4

Preemptive job-shop scheduling problems with a fixed number.. 

Osnabrücker Schriften zur Mathematik, Reihe P, Preprints ; 184
Exemplar:  Zentrale:Magazin bc 1217-184
 
?
5

On the complexity of two machine job shop scheduling with s.. 

Osnabrücker Schriften zur Mathematik, Reihe P, Preprints ; 172
Exemplar:  Zentrale:Magazin bc 1217-172
 
1-5