Wang, JB
917  Ergebnisse:
Personensuche X
?
1

An experimental investigation into ballistic performance of..:

Xu, LZ ; Ren, WK ; Wang, JB..
Textile Research Journal.  93 (2022)  9-10 - p. 2394-2408 , 2022
 
?
2

Dynamic analysis of a strange novel chaotic fractional-orde..:

Wang, J-B ; Ma, L-F ; Liu, J-K
Indian Journal of Physics.  96 (2021)  10 - p. 2907-2920 , 2021
 
?
3

Searching for gravitational-wave bursts from cosmic string ..:

Yonemaru, N ; Kuroyanagi, S ; Hobbs, G...
Monthly Notices of the Royal Astronomical Society.  501 (2020)  1 - p. 701-712 , 2020
 
?
4

Commensal discovery of four fast radio bursts during Parkes..:

Zhu, X-J ; Zhang, L ; Wang, J-B...
Monthly Notices of the Royal Astronomical Society.  488 (2019)  1 - p. 868-875 , 2019
 
?
7

Flavonoids, antioxidant activity and aroma compounds analys..:

Zhao, G ; Peng, LX ; Zou, L...
Indian Journal of Pharmaceutical Sciences.  77 (2015)  6 - p. 661 , 2015
 
?
 
?
9

Worst-case analysis for flow shop scheduling problems with ..:

Wang, J-B ; Wang, M-Z
The Journal of the Operational Research Society.  63 (2012)  1 - p. 130-137 , 2012
 
?
10

Worst-case analysis for flow shop scheduling problems with ..:

Wang, J-B ; Wang, M-Z
Journal of the Operational Research Society.  63 (2012)  1 - p. 130-137 , 2012
 
?
11

Scheduling jobs with chain precedence constraints and deter..:

Wang, J-B ; Wang, J-J ; Ji, P
Journal of the Operational Research Society.  62 (2011)  9 - p. 1765-1770 , 2011
 
?
12

Single-machine scheduling to minimize total absolute differ..:

Sun, L-H ; Sun, L-Y ; Wang, J-B
Journal of the Operational Research Society.  62 (2011)  4 - p. 768-775 , 2011
 
?
13

Scheduling jobs with chain precedence constraints and deter..:

Wang, J-B ; Wang, J-J ; Ji, P
The Journal of the Operational Research Society.  62 (2011)  9 - p. 1765-1770 , 2011
 
?
14

Parallel machines scheduling with a deteriorating maintenan..:

Wang, J-J ; Wang, J-B ; Liu, F
Journal of the Operational Research Society.  62 (2011)  10 - p. 1898-1902 , 2011
 
?
15

Parallel machines scheduling with a deteriorating maintenan..:

Wang, J-J ; Wang, J-B ; Liu, F
The Journal of the Operational Research Society.  62 (2011)  10 - p. 1898-1902 , 2011
 
1-15