Zhong, Guang-Yu
21697  Ergebnisse:
Personensuche X
?
 
?
5

Five-axis toolpath re-scheduling for facilitating assisted ..:

Li, Pei-Yao ; Song, De-Ning ; Li, Jing-Hua...
The International Journal of Advanced Manufacturing Technology.  130 (2024)  7-8 - p. 3583-3607 , 2024
 
?
7

Non-isometric dual-spline interpolation for five-axis machi..:

Song, De-Ning ; Zheng, De-Wei ; Zhong, Yu-Guang..
Journal of Manufacturing Processes.  79 (2022)  - p. 827-843 , 2022
 
?
8

Global smoothing of short line segment toolpaths by control..:

Song, De-Ning ; Ma, Jian-Wei ; Zhong, Yu-Guang.
Mechanical Systems and Signal Processing.  160 (2021)  - p. 107908 , 2021
 
?
9

A fully real-time spline interpolation algorithm with axial..:

Song, De-Ning ; Ma, Jian-Wei ; Zhong, Yu-Guang...
The International Journal of Advanced Manufacturing Technology.  113 (2021)  7-8 - p. 1873-1886 , 2021
 
?
 
?
 
?
14

Scheduling of shipyard block erection system based on Petri..:

, In: International Conference on Advanced Technology of Design and Manufacture (ATDM 2010),
Zhong Yu-guang ; Zhan Yong ; Shi Wei-min - p. 127-133 , 2010
 
?
15

Application of neural network method to process planning in..:

Zhong, Yu-guang ; Qiu, Chang-hua ; Shi, Dong-yan
Journal of Marine Science and Application.  3 (2004)  2 - p. 42-45 , 2004
 
1-15
Mehr Literatur finden