CMS Tracker Collaboration
49  results:
Search for persons X
?
1

CMS Outer Tracker Phase-2 Upgrade on-module powering:

Zografos, A. ; Blanchot, G. ; Kovacs, M....
Journal of Instrumentation.  19 (2024)  2 - p. C02031 , 2024
 
?
2

Stand-alone cosmic muon reconstruction before installation ..:

Collaboration, CMS Tracker
Journal of Instrumentation.  4 (2009)  5 - p. P05004-P05004 , 2009
 
?
3

CMS inner tracker upgrade:

CMS Tracker Collaboration ; Luukka, P.-R
CMS Tracker Collaboration & Luukka , P-R 2019 , ' CMS inner tracker upgrade ' , PoS Proceedings of Science , vol. 373 ..  , 2021
 
?
4

Selection of the silicon sensor thickness for the Phase-2 u..:

CMS Tracker Collaboration ; Adam, W ; Bergauer, T...
info:eu-repo/semantics/altIdentifier/doi/10.1088/1748-0221/16/11/P11028.  , 2021
 
?
5

The CMS Outer Tracker Upgrade for the HL-LHC:

CMS Tracker Collaboration ; Dierlamm, Alexander
info:eu-repo/semantics/altIdentifier/wos/000461827900051.  , 2020
 
?
6

Test beam demonstration of silicon microstrip modules with ..:

CMS Tracker Collaboration ; Adam, W ; Steininger, H...
info:eu-repo/semantics/altIdentifier/doi/10.1088/1748-0221/13/03/P03003.  , 2018
 
?
8

Test beam demonstration of silicon microstrip modules with ..:

The CMS Tracker collaboration ; Adam, Wolfgang ; Bachmair, Felix...
info:eu-repo/semantics/altIdentifier/doi/10.1088/1748-0221/13/03/P03003.  , 2018
 
?
 
?
14

Beam test performance of a prototype module with Short Stri..:

The Tracker Group of the CMS collaboration
The Tracker Group of the CMS collaboration. "Beam test performance of a prototype module with Short Strip ASICs for the CMS HL-LHC tracker upgrade." Journal of Instrumentation, 17, (2022) IOP Publishing: https://doi.org/10.1088/1748-0221/17/06/P06039..  , 2022
 
1-15