Chang, Shi-Chung
23315  results:
Search for persons X
?
1

Novel integer L-shaped method for parallel machine scheduli..:

Fan, Zhengyang ; Ji, Ran ; Chang, Shi-Chung.
Computers & Industrial Engineering.  193 (2024)  - p. 110282 , 2024
 
?
2

On Sustainability of a Hospital-as-Vertical-Operator Model ..:

, In: 2023 22nd International Symposium on Communications and Information Technologies (ISCIT),
Chang, Wen-Hsi ; Yang, Yi-Nung ; Lu, Hui-Chen. - p. 346-350 , 2023
 
?
3

Data Cleansing With Minimum Distortion for ML-Based Equipme..:

Hsieh, Yun-Che ; Chen, Chieh-Yu ; Liao, Da-Yin..
IEEE Transactions on Semiconductor Manufacturing.  36 (2023)  4 - p. 506-514 , 2023
 
?
4

Equipment Sensor Data Cleansing Algorithm Design for ML-Bas..:

, In: 2022 International Symposium on Semiconductor Manufacturing (ISSM),
 
?
 
?
7

Independent Coordination for Sharing Spectrum and Small Cel..:

, In: 2018 5th International Conference on Control, Decision and Information Technologies (CoDIT),
Ma, Lin-Yin ; Wei, Shyue-Win ; Chang, Shi-Chung... - p. 959-965 , 2018
 
?
8

Setting daily production targets with novel approximation o..:

Kao, Yu-Ting ; Chang, Shi-Chung
Journal of Manufacturing Systems.  49 (2018)  - p. 107-120 , 2018
 
?
9

Decentralized dispatching for blocking avoidance in automat..:

, In: Proceedings of the 2016 Winter Simulation Conference,
Chen, Yen-Shao ; Wu, Cheng-Hung ; Chang, Shi-Chung - p. 2580-2586 , 2016
 
?
10

A contract of purchase commitments on shared yields as a ri..:

, In: Proceedings of the 40th Conference on Winter Simulation,
Yang, Yi-Nung ; Chang, Shi-Chung - p. 2244-2250 , 2008
 
?
11

Priority mix planning for cycle time-differentiated semicon..:

, In: Proceedings of the 40th Conference on Winter Simulation,
Chang, Shi-Chung ; Su, Shin-Shyu ; Chen, Ke-Ju - p. 2251-2259 , 2008
 
?
12

Reverse auction-based job assignment among foundry fabs:

Chang, Shi-Chung ; Hsieh, Ming-Ming ; Chen, Chia-Wei
International Journal of Production Research.  45 (2007)  3 - p. 653-673 , 2007
 
?
15

Translating overall production goals into distributed flow ..:

Hu, Ming-Der ; Chang, Shi-Chung
Journal of Manufacturing Systems.  22 (2003)  1 - p. 46-63 , 2003
 
1-15