Doh, Hyoung-Ho
396  results:
Search for persons X
?
1

Dynamic lot-sizing for remanufacturing systems with multi-l..:

Doh, Hyoung-Ho ; Lee, Dong-Ho
Applied Mathematical Modelling.  125 (2024)  - p. 789-808 , 2024
 
?
3

Integrated disassembly and reprocessing lot-sizing for mult..:

Doh, Hyoung-Ho ; Lee, Dong-Ho
Engineering Optimization.  54 (2021)  9 - p. 1476-1493 , 2021
 
?
4

Batching and scheduling for a single-machine flexible machi..:

Shin, Jeong-Hoon ; Yu, Jae-Min ; Doh, Hyoung-Ho..
International Journal of Production Research.  58 (2019)  3 - p. 863-877 , 2019
 
?
5

Due-Date Based Multi-period Part Selection for Flexible Man..:

, In: IFIP Advances in Information and Communication Technology; Advances in Production Management Systems. Production Management for Data-Driven, Intelligent, Collaborative, and Sustainable Manufacturing,
Zeid, Issa B. ; Doh, Hyoung-Ho ; Shin, Jeong-Hoon. - p. 443-449 , 2018
 
?
6

A priority scheduling approach for flexible job shops with ..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Doh, Hyoung-ho ; Yu, Jae-min ; Kim, Ji-su... (2013)  12 - p. 3748-3764
Copies: Zentrale;
 
?
7

Input sequencing and scheduling for a reconfigurable manufa..:

Yu, Jae-Min ; Doh, Hyoung-Ho ; Kim, Ji-Su...
The International Journal of Advanced Manufacturing Technology.  67 (2013)  1-4 - p. 157-169 , 2013
 
?
8

A priority scheduling approach for flexible job shops with ..:

Doh, Hyoung-Ho ; Yu, Jae-Min ; Kim, Ji-Su..
International Journal of Production Research.  51 (2013)  12 - p. 3748-3764 , 2013
 
?
9

Disassembly leveling and lot sizing for multiple product ty..:

Kang, Kyung-Wan ; Doh, Hyoung-Ho ; Park, Jung-Hyeon.
The International Journal of Advanced Manufacturing Technology.  82 (2012)  9-12 - p. 1463-1473 , 2012
 
?
10

Loading algorithms for flexible manufacturing systems with ..:

Kim, Hyung-Won ; Yu, Jae-Min ; Kim, Ji-Su...
The International Journal of Advanced Manufacturing Technology.  58 (2011)  5-8 - p. 683-691 , 2011
 
?
11

A two-stage heuristic for single machine capacitated lot-si..:

Shim, Ik-Soo ; Kim, Hyeok-Chol ; Doh, Hyoung-Ho.
Computers & Industrial Engineering.  61 (2011)  4 - p. 920-929 , 2011
 
?
12

A Predictive Model with Data Scaling Methodologies for Fore..:

Kim, Jae-Dong ; Hwang, Ji-Hwan ; Doh, Hyoung-Ho
https://publications.drdo.gov.in/ojs/index.php/dsj/article/view/19129/8149.  , 2023
 
?
13

Due-Date Based Multi-period Part Selection for Flexible Man..:

Zeid, Issa ; Doh, Hyoung-Ho ; Shin, Jeong-Hoon.
info:eu-repo/semantics/altIdentifier/doi/10.1007/978-3-319-99704-9_54.  , 2018
 
1-15