Shiau, Yau-Ren
100  results:
Search for persons X
?
3

Key improvement decision analysis mechanism based on overal..:

Shiau, Yau-Ren ; Wang, Shun-Yu
Journal of Industrial and Production Engineering.  38 (2020)  1 - p. 66-73 , 2020
 
?
5

Design and Simulation of a Porous Rectangular Board-Foldabl..:

Shiau, Yau-Ren ; Fang, Jiunn ; Chen, Yu-Lan
IOP Conference Series: Materials Science and Engineering.  644 (2019)  1 - p. 012027 , 2019
 
?
 
?
 
?
11

Deteriorating job scheduling to minimize the number of late..:

Lee, Wen-Chiung ; Lin, Jian-Bang ; Shiau, Yau-Ren
Computers & Industrial Engineering.  61 (2011)  3 - p. 782-787 , 2011
 
?
12

A two-machine flowshop scheduling problem with deterioratin..:

Lee, Wen-Chiung ; Shiau, Yau-Ren ; Chen, Shiuan-Kang.
International Journal of Production Economics.  124 (2010)  1 - p. 188-197 , 2010
 
?
13

A single-machine scheduling problem with two-agent and dete..:

Lee, Wen-Chiung ; Wang, Wei-Jhe ; Shiau, Yau-Ren.
Applied Mathematical Modelling.  34 (2010)  10 - p. 3098-3107 , 2010
 
?
14

Scheduling deteriorating jobs to minimize the makespan on a..:

Wu, Chin-Chia ; Shiau, Yau-Ren ; Lee, Ling-Huei.
The International Journal of Advanced Manufacturing Technology.  44 (2009)  11-12 - p. 1230-1236 , 2009
 
?
15

Single-machine group scheduling problems with deterioration..:

Wu, Chin-Chia ; Shiau, Yau-Ren ; Lee, Wen-Chiung
Computers & Operations Research.  35 (2008)  5 - p. 1652-1659 , 2008
 
1-15