Solberg, James J.
183  results:
Search for persons X
?
1

An agent-based flexible routing manufacturing control simul..:

, In: Proceedings of the 26th conference on Winter simulation,
Lin, Grace Y. ; Solberg, James J. - p. 970-977 , 1994
 
?
5

Variance reduction techniques in stochastic shortest route ..:

Grant III, Floyd H. ; Solberg, James J.
Mathematics and Computers in Simulation.  25 (1983)  4 - p. 366-375 , 1983
 
?
6

Loading and control policies for a flexible manufacturing s..:

STECKE, KATHRYN E. ; SOLBERG, JAMES J.
International Journal of Production Research.  19 (1981)  5 - p. 481-490 , 1981
 
?
7

Capacity Planning with a Stochastic Workflow Model:

Solberg, James J.
A I I E Transactions.  13 (1981)  2 - p. 116-122 , 1981
 
?
8

The Stochastic shortest route problem:

, In: Operations research / Institute for Operations Research and the Management Sciences
Copies: Zentrale;
 
?
 
?
10

Operational control of item flow in versatile manufacturing..:

NOF, SHIMON Y. ; BARASH, MOSHE M. ; SOLBERG, JAMES J.
International Journal of Production Research.  17 (1979)  5 - p. 479-489 , 1979
 
?
11

A graph theoretic formula for the steady state distribution..:

, In: Management science
Solberg, James J.. (1975)  9 - p. 1040-1048
Copies: Zentrale;
 
?
 
?
13

Active Electrolocation for Underwater Target Localization:

Solberg, James R. ; Lynch, Kevin M. ; MacIver, Malcolm A.
The International Journal of Robotics Research.  27 (2008)  5 - p. 529-548 , 2008
 
?
14

Robotic Electrolocation: Active Underwater Target Localizat..:

, In: Proceedings 2007 IEEE International Conference on Robotics and Automation,
 
?
15

Response from a School Board Member:

Solberg, James G.
Monthly Labor Review.  89 (1966)  6 - p. 622-623 , 1966
 
1-15