Yao, Ming-jong
2137  results:
Search for persons X
?
2

How SERU production system improves manufacturing flexibili..:

Liu, Chang ; Li, Zhen ; Tang, Jiafu..
Annals of Operations Research.  316 (2021)  1 - p. 529-554 , 2021
 
?
3

Optimal replenishment and inventory financing strategy in a..:

Yao, Ming-Jong ; Lin, Jen-Yen ; Lee, Chieh.
Journal of the Operational Research Society.  72 (2020)  10 - p. 2196-2210 , 2020
 
?
4

An integrated algorithm for solving multi-customer joint re..:

Yao, Ming-Jong ; Lin, Jen-Yen ; Lin, Yu-Liang.
Transportation Research Part E: Logistics and Transportation Review.  138 (2020)  - p. 101896 , 2020
 
?
5

The joint replenishment problem with trade credits:

Lin, Jen-Yen ; Yao, Ming-Jong
Journal of Global Optimization.  76 (2019)  2 - p. 347-382 , 2019
 
?
6

An efficient search algorithm for obtaining the optimal rep..:

Yao, Ming-Jong ; Hsu, Tien-Cheng
Journal of Industrial and Production Engineering.  35 (2018)  2 - p. 118-128 , 2018
 
?
7

Optimal lot-sizing and joint replenishment strategy under a..:

Yao, Ming-Jong ; Huang, Jia-Yen
Journal of Intelligent Manufacturing.  28 (2014)  3 - p. 791-803 , 2014
 
?
8

On the optimal lot-sizing and scheduling problem in serial-..:

, In: International journal of production research / Institution of Production Engineers ; American Institute of Industrial Engineers ; Society of Manufacturing Engineers
Huang, Jia-yen ; Yao, Ming-jong. (2013)  3 - p. 735-750
Copies: Zentrale;
 
?
9

On the optimal lot-sizing and scheduling problem in serial-..:

Huang, Jia-Yen ; Yao, Ming-Jong
International Journal of Production Research.  51 (2013)  3 - p. 735-750 , 2013
 
?
10

Scheduling of transportation fleet maintenance service by a..:

Yao, Ming-Jong ; Huang, Jia-Yen
Optimization Methods and Software.  29 (2013)  3 - p. 592-609 , 2013
 
?
11

Solving the Economic Lot and Inspection Scheduling Problem ..:

Yao, Ming-Jong ; Chen, Shih-Chieh ; Chang, Yu-Jen.
Journal of the Chinese Institute of Industrial Engineers.  29 (2012)  1 - p. 43-60 , 2012
 
?
12

An optimal search algorithm for coordinating production and..:

Yao, Ming-Jong ; Huang, Jia-Yen
Journal of Information and Optimization Sciences.  31 (2010)  1 - p. 1-36 , 2010
 
?
13

Solving the economic lot scheduling problem with multiple f..:

Chang, Yu-Jen ; Yao, Ming-Jong
Journal of Information and Optimization Sciences.  31 (2010)  4 - p. 809-835 , 2010
 
?
14

A NEW COOPERATIVE SCENARIO FOR SUPPLY CHAINS USING COMMON R..:

Yao, Ming-Jong ; Chiou, Chuang-Chun
Journal of the Operations Research Society of Japan.  52 (2009)  3 - p. 263-282 , 2009
 
?
15

A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING..:

Chang, Yu-Jen ; Yao, Ming-Jong
Journal of the Chinese Institute of Industrial Engineers.  26 (2009)  5 - p. 411-425 , 2009
 
1-15
Related subjects